There were two AOB items introduced at the Cabinet meeting on the 29th March 2012. The first was about the future of the Pacific Road Arts Centre/Tramway/Museum and the second was on Compromise Contracts. As the reports aren’t on the Council’s website links are included below. Pacific Road Arts Centre, Transport Museum and Tramway Birkenhead: … Continue reading “Cabinet (Wirral Council) 29th March 2012 AOB: Pacific Road Arts Centre, Transport Museum & Tramway, Birkenhead, Compromise Contracts”
There were two AOB items introduced at the Cabinet meeting on the 29th March 2012. The first was about the future of the Pacific Road Arts Centre/Tramway/Museum and the second was on Compromise Contracts. As the reports aren’t on the Council’s website links are included below.
Pacific Road Arts Centre, Transport Museum and Tramway Birkenhead: Outcome of Tender Exercise
Page 1 of 9
Page 2 of 9
Page 3 of 9
Page 4 of 9
Page 5 of 9
Page 6 of 9
Page 7 of 9
Page 8 of 9
Page 9 of 9
Compromise Contracts
Page 1 of 11
Page 2 of 11
Page 3 of 11
Page 4 of 11
Page 5 of 11
Page 6 of 11
Page 7 of 11
Page 8 of 11
Page 9 of 11
Page 10 of 11
Page 11 of 11
53.402022-3.070415